SOR No Description of Service Tariff chargeable from users of RWC Ghaziabad (Rs. Per MT)
Jute/HDP Bags Paper Bags
1 (a)   For unloading bags of Fertilizers/Cement/Salt   from wagons/ rakes/ jumbo rakes / trucks or any other transport vehicle and stacking the bags on the platform/ground if required and then stacking the same in the godowns wherever necessary upto the prescribed height as mentioned in Section-VI-(B)-1(i). 46/- 62/-
1 (b) For taking out the bags of Fertilizers/Cement/Salt from the stack and loading them into the parties’ truck/ wagon for delivery/dispatch as mention in Section-VI-(B)-1(i)(b). 46/- 62/-
2 For unloading bags of Fertilizers/Cement/Salt from wagons/trucks or any other transport vehicles and directly loading them into the trucks/wagons as per Section-VI-(B)-1(ii)(a). 46/- 62/-
3. Shifting of such quantity of Fertilizers/Cement/salt as may be required day to day by the Terminal Manager from one godown to another godown or from one compartment to another compartment in the same premises as per Section-VI-B-3. 48/- 62/-
4. For unloading the bags from wagons and stacking at the platform/ ground loading into trucks, transferring to other shed (s), unloading & stacking inside the godown as mentioned in Section-VI-(B)-(4). 48/- 62/-
5. For supply of Casual Labour as mentioned in Section-VI-(B)-(3). As per Minimum wages fixed by U.P.Govt.

 

SoR as per appendix IV-B

SOR No. Description of Service Tariff chargeable from users of RWC Ghaziabad (Rs. Per MT)  
1(a) For unloading bags of foodgrain and any other notified commodities   from wagons/ rakes/ jumbo rakes / trucks or any other transport vehicle and stacking the bags on the platform/ground if required and then stacking the same in the godowns wherever necessary upto the prescribed height as mentioned in Section-VI-B-1(i)(a). 46/-
1(b) For taking out the bags of foodgrain and any other notified commodities from the stack and loading them into the parties truck/ wagon for delivery/dispatch as mention in Section-VI-B-1(i) (b). 46/-
2 For unloading bags of foodgrain and any other notified commodities from wagons/trucks or any other transport vehicles and directly loading them into the trucks/wagons as per Section-VI-B-1(ii) (a). 46/-
3 Shifting of such quantity of Foodgrain and any other notified commodities as may be required day to day by the Terminal Manager from one godown to another godown or from one compartment to another compartment in the same premises as per Section-VI-B-(2). 46/-
4 For unloading the bags from wagons and stacking at the platform/ ground loading into trucks, transferring to other shed (s), unloading & stacking inside the godown as mentioned in Section-VI-B-(4). 46/-
5 For supply of Casual Labour as mentioned in Section-VI-B-(4). As per Minimum wages fixed by U.P.Govt.

 

SoR as per appendix IV-C

SOR No. Description of Service Tariff chargeable from users of RWC Ghaziabad (Rs. Per MT)
 
1(a) For unloading the bags from wagons /rakes/ jumbo rakes/trucks or any other transport vehicle and stacking the bags on the platform / ground upto the prescribed height as mentioned in Section-VI-B-1(iii) (a). 46/-
1(b) For taking out the bags from the stacks in the platform/ ground and loading them into the parties truck/ wagon for delivery/ dispatch as mentioned in Section-VI-B-1(iii) (b). 46/-
2 For unloading the bags from wagons/ trucks or any other transport vehicles and directly loading them into the parties trucks/ wagons for delivery/ dispatch as mentioned in Section-VI-B-1(iii) (c). 46/-
3(a) For unloading the bags from wagons and stacking at the platform/ ground loading into trucks, transferring to RWC, unloading & stacking inside RWC godown as mentioned in Section-VI-B-1(iii) (d). 46/-
3(b) For taking out the bags from stacks in the RWC godown and load them into the truck and carry it to non-RWC siding, stacking in the platform/ ground if required and loading into the wagon as mentioned in Section-VI-B-1(iii) (e). 46/-

 

Storage Tariff
1

Reservation (wef.-01.05.2021)      Single Brand                 Rs 180/MT/Month              

2 GENERAL TARIFF (FOR STORAGE) Day Rate per Day
1st Day Rs.20/-MT
2-3 Day Rs.25/-MT
4-5 Day Rs.25/-/MT
6-10 Day Rs.30/-MT
11-20 Day Rs.45/-MT
21 Day Onwards Rs.60/-MT

 

Insurance & Document w.e.f 01.07.2020

1 Cement 7
2 Sugar 8
  • Office Area Rate Rs. 250.00/Square Meter/Month, effective from 18.06.2019.

Note:
* Good & Service Tax as applicable shall be levied extra on the above rates of tariff from users as applicable from time to time.

* 100% extra payment shall be charged for handling of stocks to/from open wagons/boxes.

* General Tariff will be applicable for stock over and above reservation quantity For any further business query,

Rajesh Kumar Singh