RWC Fatuha , Bihar

TARIFFS APPLICABLE AT RWC - Fatuha (Bihar)


Storage, Handling & Reservation wef: 10.02.2020

1. SOR as per appendix-IV-A:-

(Item Rate schedule for Fertilizer/cement/salt)

SoR No. Description of Service Tariff chargeable from users of RWC Fatuha  (Rs. Per MT)
Jute/HDP Bags (Rs.) Paper Bags (Rs.)
1 (a) For unloading bags of Fertilizers/Cement/Salt   from wagons/ rakes/ jumbo rakes / trucks or any other transport vehicle and stacking the bags on the platform/ground if required and then stacking the same in the godowns wherever necessary upto the prescribed height as mentioned in Section-VI-(B)-1(i) (a). 76 83
1 (b) For taking out the bags of Fertilizers/Cement/ Salt from the stack and loading them into the parties’ truck/ wagon for delivery/dispatch as mention in Section-VI-B- 1(i) (b). 76 83
2 (a) For unloading bags of Fertilizers/Cement/Salt from wagons/trucks or any other transport vehicles and directly loading them into the trucks/wagons as per Section-VI-B- 1(ii) (a). 77 80
2 (b) For unloading the bags of Fertilizers/Cement/ Salt from wagons/trucks or any other transport vehicles and directly loading them into the trucks/wagons across the warehouse as mentioned in Section-VI-B- 1(ii) (b). 77 80
3 Shifting of such quantity of Fertilizers/Cement/ salt as may be required day to day by the Terminal Manager from one godown to another godown or from one compartment to another compartment in the same premises as per Section-VI-B-2. 73 80
4 For unloading the bags from wagons and stacking at the platform/ ground loading into trucks, transferring to other shed (s), unloading & stacking inside the godown as mentioned in Section-VI-B-(4). 73 80
5 For supply of Casual Labour as mentioned in Section-VI-B-(3). Minimum Wages fixed by Bihar Govt.

 

2. SOR as per appendix-IV-B:-

(Item Rate schedule for Food grain/any other notified commodity)

SoR No. Description of Service Tariff chargeable from users of RWC Fatuha  (Rs. Per MT)
1 (a) For unloading bags of foodgrain and any other notified commodities      from wagons/ rakes/ jumbo rakes / trucks or any other transport vehicle and stacking the bags on the platform/ ground if required and then stacking the same in the godowns wherever necessary up to the prescribed height as mentioned in Section-VI-B-1(i) (a). 77
1 (b) For taking out the bags of foodgrain and any other notified commodities from the stack and loading them into the parties truck/ wagon for delivery/dispatch as mention in Section-VI-B-1(i) (b). 77
2 (a) For unloading bags of foodgrain and any other notified commodities from wagons/trucks or any other transport vehicles and directly loading them into the trucks/wagons as per Section-VI-B--1(ii) (a). 77
2 (b) For unloading the bags of foodgrain and any other notified commodities from wagons/trucks or any other transport vehicles and directly loading them into the trucks/wagons across the warehouse as mentioned in Section-VI-B-1(ii) (b) 77
3 Shifting of such quantity of Foodgrain and any other notified commodities as may be required day to day by the Terminal Manager from one godown to another godown or from one compartment to another compartment in the same premises as per Section-VI-B-(2). 77
4 For unloading the bags from wagons and stacking at the platform/ ground loading into trucks, transferring to other shed (s), unloading & stacking inside the godown as mentioned in Section-VI-B-(4). 77
5 For supply of Casual Labour as mentioned in Section-VI-B-(4). Minimum Wages fixed by Bihar Govt.

 

3. SOR as per appendix-IV-C:-

(Item of schedule for handling of stock at Non railway siding)

SoR No. Description of Service Tariff chargeable from users of RWC Fatuha  (Rs. Per MT)
1 (a) For unloading the bags from wagons /rakes/ jumbo rakes/trucks or any other transport vehicle and stacking the bags on the platform / ground upto the prescribed height as mentioned in Section-VI-B-1(iii) (a). 80
(b) For taking out the bags from the stacks in the platform/ ground and loading them into the parties truck/ wagon for delivery/ dispatch as mentioned in Section-VI-B-1(iii) (b). 77
2 For unloading the bags from wagons/ trucks or any other transport vehicles and directly loading them into the parties trucks/ wagons for delivery/ dispatch as mentioned in Section-VI-B-1(iii) (c). 77
3 (a) For unloading the bags from wagons and stacking at the platform/ ground loading into trucks, transferring to RWC, unloading & stacking inside RWC godown as mentioned in Section-VI-B-1(iii) (d). 77
(b) For taking out the bags from stacks in the RWC godown and load them into the truck and carry it to non-RWC siding, stacking in the platform/ ground if required and loading into the wagon as mentioned in Section-VI-B-1(iii) (e). 77

Note: Insurance and Documentation charges in Rs. per MT.

1  Sugar/Any other commodity 8
2 Cement 7

4. For Outward cargo Storage Tariff:-

Day Daily Storage Tariff/MT/Day (Rs.)
1st  – 5th 10
6th – 8th 12
9th – 12th 15
13th – 15th 20
16th – 24th 25
25th & above 35

*Storage for Packaged (01.06.21)

Day Cement/Salt/ Fertilizer Sugar Other Commodity
​1st-30th days 107 168 138
31st-45 days 60 100 100
​46th-60th days 70 120 110
61st-75th days 80 125 120
​76th-90th days 90 130 125
​91st-105th days 100 135 130
106th-120th days 105 140 135

 

* Goods and Service Tax as applicable shall be levied extra on the above rates of tariff from users as applicable from time to time.

* 100% extra payment shall be charged for handling of stocks to/ from open wagons/ boxes.