Tariff-RWC SANATHNAGAR, (AP)

TARIFFS APPLICABLE AT SANATHNAGAR, (AP)

Storage wef 01-05-22
Handling wef 11-12-20

 

FOR HANDLING OF STOCK AT RWC SIDING :

Sr.No. Description of Services Rates per MT (in Rs.) Fertilizer/Salt/Cement At RWC Siding Rates per MT (in Rs.)Food grain/other notified commodities
Jute/HDPE Bag Paper Bag
1(a) For unloading bags from wagons/ rakes/ jumbo rakes/trucks or any other transport vehicle and stacking the bags on the platform/ground if required and then stacking the same in the godowns wherever necessary up to the prescribed height as mentioned in Section VI-B-1(i) (a). 116/- 195/- 192/-
1(b) For taking out the bags from the stack and loading them into the parties truck/ wagon for delivery/dispatch as mention in Section VI-B-1(i) (b). 96/- 123/- 192/-
2(a) For unloading bags from wagons/trucks or any other transport vehicles and directly loading them into the trucks/wagons as per Section VI-B-1(ii) (a). 227/- 249/- 408/-
2(b) For unloading the bags from wagons/trucks or any other transport vehicles and directly loading them into the trucks/wagons across the warehouse as mentioned in Section VI-B-1(ii) (b) 299/- 395/- NA
3 Shifting of such quantity as may be required day to day by the Terminal Manager from one godown to another godown or from one compartment to another compartment in the same premises as per Section VI-B-(2). 479/- 588/- 408/-
4 For unloading the bags from wagons/stacking at the plateform/ground loading into trucks, transferring to the other shed (s), unloading & stacking inside the godown as mentioned in the clause VI-B-(4) 479/- 588/- 456/-
5 For supply of Casual Labour as mentioned in Clause XVII Part-I- (4). NA/- NA/- NA/-

 

FOR HANDLING OF STOCK AT NON RWC SIDING :

Sr.No. Description of Services Rates per MT
1(a) For unloading the bags from wagons /rakes/ jumbo rakes/trucks or any other transport vehicle and stacking the bags on the platform/ground up to the prescribed height as mentioned in Section VI-B-1(i) (a). 192/-
1(b) For taking out the bags from the stacks in the platform/ ground and loading them into the parties truck/ wagon for delivery/ dispatch as mentioned inSection VI-B-1(i) (b). 192/-
2 For unloading the bags from wagons/ trucks or any other transport vehicles and directly loading them into the parties trucks/ wagons for delivery/ dispatch as mentioned in Section VI-B-1(ii) (a). 408/-
3 For unloading the bags from wagons and stacking at the platform/ ground loading into trucks, transferring to RWC, unloading & stacking inside RWC godown as mentioned in Section VI-B-3 408/-
4 For taking out the bags from stacks in the RWC godown and load them into the truck and carry it to non-RWC siding, stacking in the platform/ ground if required and loading into the wagon as mentioned in Section VI-B-5 456/-

 

SoR as per appendix IV-D

SOR Item No Description of Service Tariff chargeable from users (Rs./MT)
1(a) For unloading parcel cargo from wagons/ rakes/ jumbo rakes / trucks or any other transport vehicle and stacking the bags on the platform/ground if required and then stacking the same in the godowns wherever necessary upto the prescribed height as mentioned in Section-VI-B-1(i) (a) 192/-
1(b) For taking out the parcel cargo  from the stack and loading them into the parties’ truck/ wagon for delivery/dispatch as mention in Section-VI-B-1(i) (b). 192/-
2 For unloading parcel cargo from wagons/trucks or any other transport vehicles and directly loading them into the trucks/wagons as per Section-VI-B-1(ii) (a) 408/-
3 Shifting of such quantity of parcel cargo  as may be required day to day by the Terminal Manager from one godown to another godown or from one compartment to another compartment in the same premises as per Section-VI-B-3 456/-
4 For unloading the parcel cargo from wagons and stacking at the platform/ ground loading into trucks, transferring to other shed (s), unloading & stacking inside the godown as mentioned in Section-VI-B-5 456/-

 

GENERAL TARIFF (FOR STORAGE)

Days

(Rs. /MT/Day)

1-3 Day 14
4-7 Day 16
8-10 Day 20
11-15 Day 27
16 Day Onwards 33
Reservation Charges (Wef-01.05.22) 132/-per MT/per Month
Reservation Charges. For Fertilizer(w.e.f 23.01.2022) 100/-per MT/per Month
Remark: General tariff will apply on the over & above quantity left after reservation.

 

Insurance & Documentation Charges W.e.f 01.05.2022

S.No. Description Rate Per MT
1 Cement Rs.8
2 Sugar Rs.9.50
3 Fertilizer/foodgrain/salt/soda Rs.7
4 Pulses Rs. 17/MT/Month

 

Storage Tariff for Reservation(per sq. meter)for Parcel/Cold chain/e-Commerce business(w.e.f-01.05.2022)

S.No. Description Per sq. meter per Month
1 Reservation Charges for Parcel/Cold chain/e-Commerce business Rs.248

1. Tariff of other commodities not linked above, please contact the undersigned.

2. The tariff is subject to change at the discretion of CRWC and the correct tariff may be confirmed with the respective RWC Terminal Manager.

3. Necessary Service Tax as prevalent will be applicable in addition.

4. For any long-term committed volumes in mutual business interests, please contact:

Sh. Rajesh Kumar Singh,  (Sr. Manager Commercial 2),C.O. CRWC Ltd.
Phone No. 011-23480111
Mob: 9810700472
Fax No. 011-23379434